There are many factors that contribute to lead times.
Long lead times – a common misconception in the marketplace that’s typically the result of a previous bad experience with a fire door manufacturer. These times vary between manufacturers and several different factors contribute to the timeframe.
Complexity of the product
Generally speaking, complex products typically result in longer lead times. For instance, 30- and 60-minute timber frames are relatively simple products, and therefore, they usually can be manufactured in a shorter timeframe. In contrast, 90- and 120-minute doors with steel frames are more complex, which leads to extended lead times. Moreover, more technical fire doors often include multiple components that our team must assemble, which increases the labor time required for each doorset.
Workload of the manufacturer:
A light workload means manufacturers can turn around your order quick. Alternatively, when fire door demand is excessive, longer lead times can start to become more common with fire door manufacturers. Soteria Doors is constantly working on specific initiatives to reduce the lead time our customers have come to expect.
Long lead times on specific materials:
Custom, bespoke items have long lead times. In general, products such as steel frames and cappings have longer lead times because we source them from third-party suppliers. Consequently, this may result in delays compared to items we produce in-house. Therefore, it’s important to factor in additional time when ordering these specific products.. Once the raw material has been manufactured these components must be integrated into our production line and the final product assembled.
Delays in receiving all detail necessary for manufacture:
Incomplete information from the customer can delay commencement of manufacture. It is always good practice to double check you have completed everything – as any delay here means an extended lead time. To ensure a smooth process, please complete your order form fully before submitting it to our team This will significantly reduce any time lag and make the process much more efficient. Additionally, if you’re unsure about any of the details on the form, feel free to reach out to us—we’re happy to help..